← All ProjectsView Full Screen ⤢BEI Electric needed a modern shop and office in Mount Prospect with room for trucks and gear. We erected the steel frame and closed it in with fire-treated sheathing and a Henry Blueskin air barrier, then added a 2" mechanically seamed standing seam roof in Hale Navy with S-5 snow rail. The walls are Nichiha Illumination panels in Fog over a rain screen, with a Coronado stone base in Smoke. Black Drutex windows and entry doors and four Hormann overhead doors finish the front, and spray foam insulation keeps the space efficient year-round.
Tell us your size and timeline. Most builds take 45–60 days, with a 10-year warranty on parts and labor.
Get a Free Quoteor call (630) 908-8889